1: Complete the Star quilt ready for quilting.
Result: I completed the quilt including quilting and binding.
2: Knit a pair of socks.
Result, using oddment of leftover wools I have passed the heel on both of them
3: Continue making the Sewcialites blocks
Result: I have made all 36 blocks and 16 setting blocks, now need to get them put together
4: Tulip Quilt cut out
Result: I managed to cut out all the fabric, and make one tulip sample block.
5: Brightside monthly quilt along started
Result: The first block is made, waiting for the next instructions
6: Machine Embroider the caravan blocks
7: Join the June Sweetpea Sewalong
Both 6 or 7 were abandoned.
I did however manage to send 5 bags of stuff to the Charity shop all from my Happy Room.
I keep telling myself it must have made a little difference.
I now need to decide what to put on my HOPE list for July, while Chris does this…
Cleaning out the pond pumps and filters!
I also have to mention he decided to take a look at a Ranger Rover that turned out to be a 220 mile round trip down south.
He bribed me with lunch out in a river side pub, but did not buy the car, so I was not needed to drive home.
We walked along the river bank after the meal.
2 comments:
Wow, you are so organized. If only some of it would rub off on me. Sigh.
You get so much done, wish I could do that
Post a Comment